Lake Street

This renovation started in the basement with the addition of 7 new Steel Channels and beams,

carrying through to the main floor with the addition of a new 21′ x 11″ Steel beam. Once all of the structure was re-supported, the house was raised in the center over 2.5″ to bring the main floor back to as level as possible.

Completion of the major structural components and the Building Envelope allowed us to turn the project back over to the more than capable hands of the homeowner to add their personal touch!